2012 Manufacturing Excellence Award Winner

2012 Manufacturing Excellence Award Winner

This handsome building’s brick faced precast panels that were built and erected to very tight tolerance resulting in a well-executed project. The detailing also contributed to the building’s success in appearing as a well-crafted contemporary masonry building. All of this was completed in a tight time frame where 401 panels were erected in 30 days.


Award Details

Design:
Shepley Bulfinch Richardson & Abbott Architects

Manufacturer:
International Concrete Products, Inc. - Germantown, WI

Category:
Educational/Spiritual

View Full Project Details